1.execution conditions:
For outdoor operation, it should be sunny and the temperature should be higher than 5℃;
Requirement on carbon steel tank: surface sand blasting
2. Construction sequence
|
construction sequence
|
construction project
|
coating times
|
thickness of dry film
|
coating interval
|
notes
|
|
|
1
|
surface treatment
|
1. grind welding spot and protrusion
2.abrasive blasting to Sa 2 1/2
3.surface cleaning
|
||||
|
2
|
first coat
|
1
|
0.1~0.2 mm
|
within 8 hr after abrasive blasting
|
Showa806 vinyl
|
|
|
3
|
putty
|
Recession filling-in |
|
3 hr - 1week
|
Showa806 vinyl
+ kaoline
|
|
|
4
|
Chopped Strand Mat
|
2
|
1.6~2 mm
|
3 hr - 1week
|
Showa806 vinyl+Chopped Strand Mat
|
|
|
5
|
surfacing mat
|
2
|
0.4 mm
|
3 hr - 1week
|
Showa806 vinyl+organic surfacing mat
|
|
|
6
|
finish
|
1
|
0.2 mm
|
3 hr - 1week
|
Showa806 vinyl
|
|